Distribuidora de electricidad del Grupo Naturgy
    • English
      • Galician
      • Spanish
      • English
    • My private area
    • Online procedures
      • Atrás
      • My network connections
        • Atrás
        • New network connection
        • Change my supply
        • Change the route of a current line
        • New generation connection
        • New self-supply connection
        • Network codes
        • Payment gateway
        • Planning certificate application
      • My supplies
        • Atrás
        • Provide meter reading data
        • My supplies
        • Change of measuring equipment ownership
      • Essential supplies
      • Special works affecting the UFD network
      • Frauds
        • Atrás
        • Reporting frauds
        • Report a fraudulent call
      • Communicate the status of a UFD installation
      • Quality compensation form
    • Services
      • Atrás
      • Self-consumption and access capacity
        • Atrás
        • Self-supply
        • Access capacity for connecting to power generation in our substations
      • Installers
        • Atrás
        • Information on differential switches
        • Low-voltage enclosure tool
        • Low-voltage self-consumption tool
        • Self-supply distribution coefficient validator
        • Approved suppliers
        • Occupational risk prevention
        • Network service locating
        • Installer manual
      • Supply companies
      • Access to distributors
      • Public authorities
        • Atrás
        • OMIC service
        • Access to documentation
      • Regulations
    • Power cuts and incidents
      • Atrás
      • Service status
      • How to detect a supply interruption
      • Notice of planned outages
      • Policy on damage to electrical appliances
    • We’ll help you
      • Atrás
      • Customer Services
      • FAQs
      • UFD Classroom
      • Complaints
      • Cybersecurity Recommendations
      • Safety tips
      • News
      • User’s manual
    • About us
      • Atrás
      • About us
      • Where we are located
      • Sustainability
      • Certifications
      • Innovation
    • gl
    • es
    • en
    Inicio / Glossary of terms

    Glossary of terms

    A
    Access billing
    Access capacity
    Access permit
    Access tariff contract
    Access tariff or network tariffs
    Account holder
    Active power
    Active power meter
    Ampere (A)
    Apparent power
    B
    Billed energy
    Billing constant
    C
    Centralisation of meters
    Centralised meter location
    Charge curves
    Cogenerator
    Conductor
    Connection
    Connection charges
    Connection point
    Connection power
    Connector
    Consumption
    Contact channel
    Contract holder
    Contracted power
    Control equipment
    Current leakage
    Customer receiver installations
    D
    Deposit
    Differential switch
    Direct measurement
    E
    Electrical installation
    Electrical resistance
    Energy cost
    Energy unit cost
    Extension charges
    Extension installation
    Extension investment
    F
    Flat hours
    Flicker
    Fuse
    G
    General Automatic Switch (G.A.S)
    General control and protective panel
    General protective box (C.G.P.)
    H
    High voltage
    High voltage mains connection
    High voltage supply
    Hours of use
    I
    Indirect measurement
    Installed capacity
    Installed capacity of a demand installation
    Installed capacity of a generation installation
    Intensity
    Interior circuit
    Interior installation
    K
    Kilovolt-ampere (kVA)
    Kilovolt-ampere reactive power (kVAr)
    Kilowatt (kW)
    Kilowatt hour (kWh)
    L
    Last Resort Plan (T.U.R.)
    Limiter
    Load forecasting
    Low voltage
    Low voltage mains connection
    Low voltage supply
    M
    Mains connection
    Mains connection charges
    Maximeter
    Maximum power
    Measuring device
    Measuring equipment rental fee
    Measuring point
    Medium voltage
    Meter
    Monophasic
    Multiple tariff meter
    N
    National Economic Activity Code (N.E.A.C.)
    Network connection
    Network point connection permit
    Node
    Nominal power
    Nominal voltage
    O
    Off-peak hours
    Ohm
    Operator of the upstream network, with regard to another
    Overload
    Overvoltage (in a network)
    Owner of the upstream network, with regard to another
    P
    Peak hours
    Power
    Power control switch (P.C.S.)
    Power cost
    Power demand
    Power distribution line
    Power generation installation
    Power generation module
    Protective conductor
    Protective system
    R
    Reactive energy meter
    Reactive energy supplement
    Reactive power
    Reading
    Reading power supplies through a reading route
    Reading power supplies using electronic measurement methods
    Receiver
    Removal of measuring equipment
    Right of access
    Right of connection to a network point
    Rolling out an installation
    S
    Seasonal supply
    Short circuit
    Subscription policy
    Supply Identification Number (N.I.S.)
    Supply request
    Switch
    T
    Tariff
    Tariff (Double)
    Tariff (Triple)
    Tariff (six periods)
    Tariff supplement
    Temporary supply
    Time-differentiated pricing
    Transformer station
    Trip switch
    Triphasic
    Triple Tariff
    U
    Universal supply point code (C.U.P.S.)
    Usage estimate
    V
    Variations in frequency
    Verification charges
    Volt (V)
    Volt ampere (VA)
    Volt-ampere reactive (VAr)
    Voltage
    Voltage fluctuation
    W
    Watt (W)
    Works supply request
    • © 2025 UFD
    • Accessibility
    • Legal notice
    • Cookies policy
    • www.naturgy.com
    • Press Room
    Confianza Online Confianza Online Confianza Online